Samstag, 15. September 2012

Repair work

First of all mistakes must be rectified.
Floor tiles on the guest bungalow terrace must be removed because the slope went towards the bedroom.  

The walls are plastered quite badly. Therefore the workers apply a latex paint and work on it with sand paper to make sure it will look alright.

The arch must be replaced.

 Parts of the walls are taken down again.  

Keine Kommentare:

Kommentar veröffentlichen