Mittwoch, 5. Dezember 2012

Moving in this Sunday?

Unfortunately that is not an option. A lot of work has been done but not necessarily inside the house.
There is no running water, no electricity, no gas and the last coat of paint and sanitary installatoins are not yet finished.

Have a look for yourself:

The drainage system is all made by hand on site


a flower bed next to the terrace

the reflective pool

the raised kitchen garden

the screens for the verandas

the outdoor kitchen

the pergola over the pool bar

and the veranda is starting to look quite promising

the colouring of the meditation room
 the main kitchen

ceiling in the living area

preparing the walls before the built-in bamboo furniture is fitted
 first in the office
 then in the walk-in wardrobe

 the doors are fitted

and the bedroom is nearly finished

custom-made windows are fitted

the dirty kitchen area

and the laundry area

in need of a well-deserved break

the resort shower is finally tackled

and the bathroom

this is a look in through the main entrance