There is no running water, no electricity, no gas and the last coat of paint and sanitary installatoins are not yet finished.
Have a look for yourself:
The drainage system is all made by hand on site
a flower bed next to the terrace
the reflective pool
the raised kitchen garden
the screens for the verandas
the outdoor kitchen
the pergola over the pool bar
and the veranda is starting to look quite promising
the colouring of the meditation room
the main kitchen
ceiling in the living area
preparing the walls before the built-in bamboo furniture is fitted
first in the office
then in the walk-in wardrobe
the doors are fitted
and the bedroom is nearly finished
custom-made windows are fitted
the dirty kitchen area
and the laundry area
in need of a well-deserved break
the resort shower is finally tackled
and the bathroom
this is a look in through the main entrance
Keine Kommentare:
Kommentar veröffentlichen